Internal — Avelia Onboarding & Timeline (CTO draft)
Client-facing onboarding + project timeline derived from Quotation Q-AVELIA-2026-001. Handover guide is written FOR Adriyana (not a separate ops admin). No Chip-in reference (per scope) unless separately agreed.
Compliance: client doc → CFO lane owns final issue. CTO scaffold only. Requires Sha's explicit send approval.
Cubic Tech Enterprise · Web Services Onboarding — Draft

Welcome, Avelia Scarves

Your WordPress Works onboarding & project timeline — Ref Q-AVELIA-2026-001

How We'll Work Together (Step by Step)

Project Timeline (September 2026)

PhaseWindowWhat happens
KickoffOn deposit receiptAccess + assets exchanged; exact completion date set.
BuildThrough September 2026All 3 items produced together; single milestone at handover.
PreviewWithin build windowYou review; 1 revision round included.
DeliveryBy agreed Sept dateFinal payment → credentials + handover guide released.

Your Responsibilities

Provide admin access, product photography, and timely feedback.

Delays in access/feedback shift the milestone accordingly.

Change password after handover.

What's Included (No Extra Cost)

Complimentary: homepage speed fixes (srcset, lazy-load, caching).

Conditional gift*: clear stale cart/sold-out entries — free if deposit paid before 5PM Sat 15 Aug 2026.

Scope Boundaries (reminder)

  • Checkout = UX / navigation repair only. No payment-gateway integration, no card-data handling, no PCI claim.
  • Images: client supplies all photography; we optimise client-provided imagery only.
  • Out of scope unless separately quoted: new features, copywriting, hosting, plugin/theme licences, ongoing support, SEO, future payment-gateway work (indicative RM300/gateway).
  • No reply on Friday / weekends; queries attended next business day.

Deliverables Status (Contract Metrics)

#DeliverableStatusProgress notesRevision window
1 Catalogue image clarity In progress — audit done Image resolution audit completed 24 Aug 2026 across all three collections. Most catalogue photos are 830–920 px wide (0.8–1.3 MP) — acceptable at normal catalogue size, but a true zoom will soften/pixelate. One outlier (Bloom) is 1600×2393 (3.8 MP) and zooms cleanly. Client Q&A logged: "possible ke if kita zoom in pun dia still clear?" — answer: yes, provided originals are re-uploaded at higher resolution (see handover note). Zoom behaviour itself is native to the product gallery; clarity is limited by source image size, not the site. Not yet opened — starts at preview
2 Checkout navigation repair In progress — core built Branded storefront, cart and checkout pages built (24 Aug 2026) with live-data wiring: add-to-cart from the shop grid, cart with basket totals (subtotal / J&T Express shipment / address / total), quantity & remove mutations, address editor, checkout summary synced live, cart-count badge snippet for the navbar. All endpoints target staging (webdevstaging.aveliascarves.com). Awaiting deployment to staging for end-to-end click-through. Not yet opened — starts at preview
3 Written operations handover guide Not started Queued per rollout order — drafted after deliverables 1–2 reach preview, so the guide documents the final (post-revision) flows. Written for Adriyana; PDF / shared doc via secure channel. Not yet opened — starts at preview

Revision rule (per contract)

One round of revisions included per deliverable, within 7 days of preview. Extra rounds RM300 each, quoted before work. No revision window has opened yet — all three deliverables are still in build.

Build Progress Log

DateItemWhat was doneStatus
24 Aug 2026 Brand & data foundation Extracted official logo colour (deep plum #5f0a62) for consistent branding; parsed the WooCommerce product export (25 products across 3 collections: Neesa Paris Bawal RM35, Ease Chiffon Shawl RM25, Hera Rayon Shawl RM35 — 9 colourways currently sold out). Done
24 Aug 2026 Storefront page storefront.html — branded shop page: hero, trust strip, 3 collection grids (25 products, image hover swaps, in-stock/sold-out badges), Shopify-standard quantity steppers + add-to-cart wired to the live store, editorial "At the Heart of Avelia" section, WooCommerce shortcodes reference for the WP build. All endpoints target staging. Built — awaiting WP install
24 Aug 2026 Cart page cart.html — branded shopping bag rendering live data via the WooCommerce Store API: real items, quantities, basket totals (subtotal / shipment rates incl. J&T Express / shipping address / total), inline "Change address" editor, remove & quantity mutations write to the real session cart. Includes the navbar cart-count badge snippet for the template's menu. Preview fallback mirrors the client's real basket (RM70 + RM7 J&T = RM77). Built — awaiting WP install
24 Aug 2026 Checkout page checkout.html — branded checkout: contact + delivery address form that saves to the live cart, payment method cards (sample; live methods render from Woo settings), live order summary synced to the cart ("Place Order · RM77.00"). Empty-cart state handled. Built — awaiting WP install
24 Aug 2026 Validation All three pages tested: add-to-cart endpoints, quantity clamping, live totals recalculation, shipping-rate switching, address save, empty states, mobile responsiveness (390px, single column, no overflow), zero console errors. Passed
Next Deployment to staging Paste storefront into the Shop page (Custom HTML block + Additional CSS + Code Snippets), assign Cart & Checkout pages under WooCommerce → Settings → Advanced, flush permalinks, verify Store API cart on same-origin staging. Pending